Hello;
I have a FAS 2240-4 Single Head with one DS4246, and want to add the next DS4246.
My Plan tooks like this:
1. Cabling of the ACP correct (picture i found ihe forum)
2. Cabling the SAS, connect the Controller with the new Shelf firt, then connect Shelf 3 with Shelf 2.
Is this a way to do it with no ninterruprion?
What do you recommend?
Many Thanks, Thomas