Quantcast
Viewing all articles
Browse latest Browse all 4945

Cluster upgrade sequence

Hello, I have a netapp metro cluster that looks like the one below. If I were to upgrade the Ontap version from 9.6x to 9.7x but by using the "cluster image update -pause-after all" option.

Will the upgrade pick the nodes in the sequence as per the HA setup? .. example, will it pick netapp01-01 first and then go to netapp01-02 and then go to netapp01-03 and then finally to netapp01-04? 

Will this always be the sequence? Would it be possible to control this sequence so we don't unknowingly upgrade node that has workload on it. 

 

If I were to move the workload manually between the nodes once two nodes are upgraded. So the customer can face minimal impact at all. Kindly advice. 

 

netapp01::> storage failover show 
                              Takeover          
Node           Partner        Possible State Description  
-------------- -------------- -------- -------------------------------------
netapp01-01    netapp01-02 true     Connected to netapp01-02
              
netapp01-02   netapp01-01 true     Connected to netapp01-01
              
netapp01-03    netapp01-04 true     Connected to netapp01-04
              
netapp01-04    netapp01-03 true     Connected to netapp01-03
              
4 entries were displayed.


Viewing all articles
Browse latest Browse all 4945

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>